[Q40-Q62] Get instant access to C_IBP_2311 Practice Tests 2024 Free Updated Today!

Share

Get instant access to C_IBP_2311 Practice Tests 2024 Free Updated Today!

Welcome to download the newest PassLeader C_IBP_2311 PDF dumps ( 80 Q&As)


SAP C_IBP_2311 Exam Syllabus Topics:

TopicDetails
Topic 1
  • General Configuration of a Planning Area
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
Topic 2
  • Solution Architecture & Data Integration
  • Configure and use Planning Operators to automate processes in your planning model
Topic 3
  • Create and use key figures and attributes to model the supply chain
  • Define and view information with user-defined charts and dashboards
Topic 4
  • Create and transform forecasts in your planning model
  • Use the Fiori Launchpad to customize the UI, work with Excel UI

 

NEW QUESTION # 40
Which of these conditions must be met to create a Local Member key figure? Note: There are 2 correct answers to this question

  • A. Users should have authorization for template administration.
  • B. Activate Local Member recognition settings is selected
  • C. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel
  • D. Use Excel Cell reference in the report editor option is selected

Answer: A,B


NEW QUESTION # 41
What is a prerequisite for modelling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Ensure that the outsourced manufacturing locations have a separate subnetwork
  • B. Model relative production costs across internal locations and outsourced manufacturing locations
  • C. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • D. Model target inventory and stocks at the outsourced manufacturing location

Answer: B


NEW QUESTION # 42
What function would you use to configure a year-to-date calculation?

  • A. Last Period Aggregation
  • B. Dynamic Rolling Aggregation
  • C. Cumulative Aggregation
  • D. Rolling Aggregation

Answer: C


NEW QUESTION # 43
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.

  • A. Minimum capacity utilization will result in pull production
  • B. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs
  • C. Excess stock can be generated and will need to be staged in an overflow warehouse
  • D. Capacity leveling will be possible for production and storage resources.

Answer: B,C


NEW QUESTION # 44
You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question

  • A. Set up a three-tier landscape using transport, starting from the development system to test and - production
  • B. Create additional planning areas in the test system to support training needs.
  • C. Create additional test planning areas in the production system to support cutover needs
  • D. Setup the two-tier landscape and have the configuration for development system regularly - updated from the production system

Answer: A,B


NEW QUESTION # 45
Which unified planning processes' data is commonly reviewed in SAP IBP for sales and operations? Mote: There are 2 correct answers to this question.

  • A. Constrained Demand plan
  • B. Inventory Plan
  • C. Consensus Demand Plan
  • D. Global Demand Plan

Answer: B,C


NEW QUESTION # 46
What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question.

  • A. Ensure discounting does not result in negative costs for each customer-product combination.
  • B. Try to go as granular as possible with the customer product
  • C. Ensure product prioritization with the combination of customer and product
  • D. Assign a high cost value (1 million or more ) for non-delivery to priority customers

Answer: A,C


NEW QUESTION # 47
You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question.

  • A. Changing the layout of the master data workbooks
  • B. SAP IBP ribbon extension
  • C. Chaging the entries from the Name Manager
  • D. Changing the member names

Answer: A,B


NEW QUESTION # 48
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question

  • A. Maximum lot size
  • B. Aggregated constraints
  • C. Adjusted transportation receipts
  • D. Transportation lead time
  • E. Minimum lot size

Answer: C,D,E


NEW QUESTION # 49
What is an example of a commonly used time-independent key figure?

  • A. Any attribute as a key figure
  • B. A currency conversion key figure, such as Exchange Rate
  • C. A unit of measure key figure, such as UoM Conversion Factor
  • D. A Special key figure marked as an aggregate key figure (aggregate constraint)

Answer: A


NEW QUESTION # 50
Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note:
There are 2 correct answers to this question.

  • A. Balancing Supply and Demand
  • B. Order Prioritization
  • C. Stock Replenishment
  • D. Inventory Build and Reduction

Answer: A,D


NEW QUESTION # 51
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question

  • A. Identify inventory items that quire closer attentions
  • B. Choose time-independent key figures as segmentation measures
  • C. Substitute missing values in case of sporadic demands.
  • D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"

Answer: A,B


NEW QUESTION # 52
You want to display and edit data in different Units of Measure (UOM). Which of the following must you consider before you use the UOM? Note: There are 3 correct answers to this question.

  • A. Units of measure are usually not time-independent.
  • B. Units of measure are usually not time-dependent
  • C. Analytics allow the user to select the target unit of measure
  • D. Units of measure is an attributes of master data type, such as product
  • E. Conversion to the target unit of measure is handled by the SAP IBP Excel add-in.

Answer: B,C,D


NEW QUESTION # 53
What are some of the available ABC segmentation methods in SAP IBP? Note: There are 2 correct answers to this question.

  • A. By Number of Items (Sorted Value)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Pareto Principle (Sorted and Calculated Values
  • D. By Number of Items (Sorted Average)

Answer: A,B


NEW QUESTION # 54
Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct answers to this question.

  • A. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network
  • B. It checks whether the sourcing in the Production Source Item master data type exists.
  • C. It reports input key figure for which no related master data exists.
  • D. It checks whether the location resource specified in the master data forms a cycle in the supply chain network
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network

Answer: A,B,E


NEW QUESTION # 55
Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply? Note: There are 3 correct answers to this question

  • A. Transportation lane
  • B. Customer
  • C. DS Order fulfilment
  • D. Location
  • E. Product

Answer: B,D,E


NEW QUESTION # 56
How do you achieve rolling aggregation with SAP IBP?

  • A. Using an attribute as a key figure
  • B. Using an appropriate period weight factor
  • C. Using a local member
  • D. Using a key figure calculation

Answer: D


NEW QUESTION # 57
Analytics charts are created by the user in the Advanced Analytics application. What can the user do in the Advanced Analytics app? Note: There are 2 correct answers to this question.

  • A. Merge charts together.
  • B. Group Data
  • C. Applying filters on there data
  • D. Trigger export to Manage Analytics stories

Answer: B,C


NEW QUESTION # 58
You are setting up planning with lot sizes. What are some of the properties of lot sizes that you need to beware of? Note: There are 2 correct answers to this question

  • A. Lot size are time-independent master data settings
  • B. Lot sizes are applicable for production and handling quantities.
  • C. Lot size are applicable for production and transportation quantities
  • D. Periodic lot size setting overrides the minimum lot size.

Answer: A,C


NEW QUESTION # 59
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct answers to this question.

  • A. Display all assigned analytics on a single UI
  • B. Add Process instances
  • C. Use drill-down functionality
  • D. Link two analytics charts.
  • E. Rename the charts

Answer: A,B,C


NEW QUESTION # 60
What are the S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
  • B. Number of fair share segments Additional tiering costs (default) Inventory days of supply
  • C. Number of fair share segments Additional tiering costs (default) Maximum inventory
  • D. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery

Answer: A


NEW QUESTION # 61
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct answers to this question.

  • A. Specify a planning horizon in the planning area for each level of the assigned time profile
  • B. Configure at most two input key figures on the same planning level in a key figure calculation
  • C. Configure at least one calculated key figure for the planning area
  • D. Assign the compound master data type and its component master data types

Answer: A,D


NEW QUESTION # 62
......

Aug-2024 Latest Pass4sureCert C_IBP_2311 Exam Dumps with PDF and Exam Engine: https://www.pass4surecert.com/SAP/C_IBP_2311-practice-exam-dumps.html

Premium Quality SAP C_IBP_2311 Online dumps: https://drive.google.com/open?id=1S6Q01ydEJnsZtibiFjPTWpSea69hxu94