
Attested C_TS422_1909 Dumps PDF Resource [2023]
Latest C_TS422_1909 Actual Free Exam Questions Updated 91 Questions
SAP C_TS422_1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
C_TS422_1909 Exam Certification Details:
| Sample Questions: | SAP C_TS422_1909 Exam Sample Question |
| Level: | Associate |
| Languages: | German, English, French, Chinese |
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
NEW QUESTION 32
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:
- A. The MRP Type of the component
- B. The Planning Strategy of the finished product
- C. The Individual/Collective indicator of the component
- D. The item category of the component in the BOM
Answer: B
NEW QUESTION 33
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used by product costing to determine how costs are rolled up.
- B. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- C. It is used in MRP to determine the sequence in which materials are planned.
- D. It is used by ATP to determine the priority of alternative components.
Answer: A,C
NEW QUESTION 34
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:
- A. Infinite resource and finite strategy
- B. Finite resource and infinite strategy
- C. Finite resource and finite strategy
- D. Infinite resource and infinite strategy
Answer: C
NEW QUESTION 35
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:
- A. It is executed on the database server
- B. The code is written in SQL Script
- C. It uses the same BAdis as classic MRP
- D. Data is read sequentially from the database tables
Answer: A,B
NEW QUESTION 36
Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.
Response:
- A. Production order total order quantity
- B. Production order header status
- C. Warehouse transfer order status
- D. Shop floor information system
Answer: D
NEW QUESTION 37
In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question.
Response:
- A. Material master of the finished product
- B. Routing, in the component allocation
- C. BOM, in the item for the material
- D. Work center, in the production supply area
Answer: C,D
NEW QUESTION 38
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. Low product complexity
- B. High product complexity
- C. High product stability
- D. Low product stability
Answer: A,C
NEW QUESTION 39
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Creating a planned order within the planning time fence
- B. Assigning a production scheduling profile
- C. Setting a planning time fence in the Material Master Record
- D. Manually changing the quantity of a planned order
Answer: A,C
NEW QUESTION 40
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP controller
- B. MRP group
- C. MRP type
- D. MRP planning file
Answer: A
NEW QUESTION 41
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:
- A. MRP Live can plan materials with recursive BOMs
- B. MRP Live can create production orders automatically
- C. MRP Live can propose alternative solutions
- D. MRP Live can priorities demand from sales orders
Answer: C
NEW QUESTION 42
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Packaging Logistics
- B. Parts interchangeability
- C. Enhanced characteristics based processes
- D. Enhanced Kanban Processing
- E. Equipment and Tools Management
Answer: A,B,D
NEW QUESTION 43
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Material Coverage Fiori app
- B. Rough-cut capacity planning
- C. Lock-free inventory movements
- D. Flow manufacturing
- E. Monitor Production Orders Fiori app
Answer: A,C,E
NEW QUESTION 44
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work Center BOM
- B. Class BOM
- C. Sales Order BOM
- D. Functional Location BOM
Answer: C,D
NEW QUESTION 45
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Outline agreement
- B. Purchasing info records
- C. Production versions
- D. Special procurement keys
- E. Quota arrangements
Answer: A,B,D
NEW QUESTION 46
Which capabilities does the Alert monitor have?
There are 3 correct answers to this question.
Response:
- A. Automatically reschedule in case of overload alerts
- B. Nominate time-dependent substitutes for a planner
- C. Automatically predict alerts in future planning cycles
- D. Generate alerts based on defined threshold values
- E. Automatically send alerts with Alert Notification Engine
Answer: B,D,E
NEW QUESTION 47
What must be used in the system to plan the requirements for different subcontractors separately?
Response:
- A. MRP areas
- B. Storage locations
- C. Production versions
- D. Planning plant
Answer: A
NEW QUESTION 48
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
Answer: C
NEW QUESTION 49
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:
- A. Handling Unit Management
- B. Labor Management
- C. Slotting
- D. Yard Management
- E. Expected goods receipt
Answer: B,C,E
NEW QUESTION 50
When do you use variant bills of materials (BOMB)?
- A. When a material has a configurable BOM
- B. When a material has multiple BOMB
- C. When multiple material also have the same BOM
- D. When multiple material is have similar BOMB
Answer: C
NEW QUESTION 51
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Bulk materials
- B. Waste products
- C. By-products
- D. Continuous flow materials
- E. Co-products
Answer: B,C,E
NEW QUESTION 52
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To provide timely updates of inventory management for the staged components
- C. To reduce the total production lead time for along production line
- D. To stage different components for a production line simultaneously
Answer: A,B
NEW QUESTION 53
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:
- A. A user can schedule a background job to release production orders (transaction COOIS).
- B. A user trigger material availability check via mass processing (transaction COHV)
- C. A user trigger printing of shop floor paper manually (transaction CO02).
- D. A user can trigger material staging via mass processing (transaction COHV).
Answer: C
NEW QUESTION 54
......
C_TS422_1909 Certification Overview Latest C_TS422_1909 PDF Dumps: https://www.pass4surecert.com/SAP/C_TS422_1909-practice-exam-dumps.html